Stabilizer Link 42420-65D00 for Suzuki and Mitsubishi
1.Product Description:
| "555" NO | "CTR" NO | OEM NO | CAR NAME | MODEL | YEAR | POSITION | COLOR | PACKING (PCS/CTN) |
MITSUBISHI | SL-7390 | CLM-4 | MB518780 | UWCER-FIORE | C51A,C52A | 87 | FRONT R/L | BLACK | 60 |
| | | | MIRAGE | | | | WHITE | |
| | | | LANCER | C61A,C62A,C63A,C64A, | 88-91 | | GOLDEN | |
| | | | | C72A,C73A,C74A | | | | |
| | | 4056A040 | AIR TREK | CU2W | 05- | | | |
SUZUKI | | CLS-1 | 42420-65D00 | GRAND VITARA | SE420 | .99-02 | | | |
2.Our Advantages:
1)More than 10 years production experience;
2)Over 7,000 kinds of product can be provided;
3)Products are popular used in Japanese, Korean, European and American Vehicles;
4)Good raw material and advanced technology;
5)12 month years warranty;
6)Quality meet the standard of ISO/TS16949:2009;
7)Modern production management system to gurantee on time delivery.
3.Product Range:
Control Arm |
Ball Joint |
Stabilizer Link |
Inner Arm Shaft Kit |
Rack End |
Tie Rod End |
Cross Rod |
Pitman Arm |
Idler Arm |
Side Rod Assy |
4.Product Packing:
1)Neutral Packing: neutral plastic bag+neutral tan box+neutral carton
2)Color Box Packing: Good Link plastic bag+ Good Link color box+ neutral carton
3)Customized Packing
5.RFQ:
Q:How many years you have been in the field of suspension and steering parts?
A:Our company was established in 2004.
Q:What is your business type, manufacturing or trading?
A:We are manufacturer, and our factory address is No. 36 Lvshu East Road, Xuejie Town, Xinbei District, Changzhou, Jiangsu, China.
Q:How many kinds of product you can provide, and what are they used for?
A:We have more than 7,000 kinds of suspension and steering parts, and they are popular used in Japanese, Korean, European and American Cars.
Q:Do you make any test about your product. And what are they?
A:Yes, and what test we do including high/low temperature test, ozon experiment, salt-fog test, torque test,pulling-out force test etc.
Q:Do you provide any gurantee about our product?
A:1 years warranty provided under normal condition.
Q:What is your MOQ and lead time?
A:MOQ: it depends on what item you are looking for, often it is around 100 to 300 pieces for each type.
Lead Time: for one 20'GP, it need about 50 to 60 days.